SteamPro Conservation
Home Contact Us  Eng | Jap
Head Office
SteamPro Conservation Sdn Bhd
No 5, Jalan PPU 3A,
Pusat Teknologi Sinar Puchong,
47100 Puchong,
Selangor, Malaysia.
Tel +603 8066 0321
Fax +603 8066 5432
info@steampro.com.my
View Location Map or Google Map
GPS
E101° 37' 0.126", N3° 0' 22.618"

Japan Office
SteamPro Japan KK
No. 209, 4-4-14, Tsukiji,
Chuo Ku,
Tokyo 104-0045 Japan.


FAQ 11: Won't it be difficult to select the correct SP-CRD model size?

Selecting the appropriate SP-CRD models does require a certain basic knowledge of the lines and equipment to be trapped. Early in SP-CRD's development, SteamPro realized that the majority of plant and facilities engineers do not have the time to spend on sizing the steam traps. Our engineers also realized that in order for SP-CRD to operate more efficiently, the unit's proper sizing was imperative.

This need for proper sizing resulted in extensive research into the multitude of factors that effect the operation of SP-CRD and steam traps.

  1. THE SP-CRD - Applications & Selection Guide: This guide can assist engineers in selecting SP-CRD for applications where sizing information or condensate flow rates are available. The guide makes it simple to select a SP-CRD model because safety factors are already included.
  2. THE SP-CRD - Field Sizing Survey: SteamPro and its field engineers can also assist customers in selecting SP-CRD models through a field trap survey performed at the facility. Trained SteamPro field engineers will make a complete list of all existing traps that are to be replaced. They will also gather appropriate sizing information for each application. The customer receives a computerized survey that lists:
    • Location of the existing steam traps by tag number
    • Working steam pressure
    • Sizing/applications information
    • SP-CRD model selections

Back to FAQs